Why Detailed Plans Reduce Costs in Gozo Renovations
Renovation cost overruns in Gozo are typically caused by missing documentation, not labour variability. Contractors estimate based on approximate understanding, then adjust once works start.
1. Remove Assumption Pricing
Dimensioned layouts, socket mapping, lighting circuits and sanitary routing must be documented to eliminate interpretation. Without this, prices shift immediately after demolition.
2. Material Specification Defines Feasibility
Each finish affects substrate preparation:
• tile thickness
• vanity depth
• LED recess dimension
• oven venting
• shower slopes
These must be planned—not discovered during construction.
3. Elevation Drawings Prevent Improvisation
Mirror heights, cabinet clearance, LED recess lines and skirting transitions require measured drawings, not verbal agreement.
4. Demolition After Planning, Not Before
Existing walls, slab thickness and drainage slopes define constraints. Demolishing first forces corrective works and re-budgeting.
5. Documentation Package
A professional set includes:
• floor plan
• lighting/electrical
• plumbing layout
• elevations
• finishes list
• cabinetry details
• construction notes